Home / Work / Bar & restaurant
Bar & restaurant

Bar & restaurant fit-out

Bar & restaurant

Location Leeds Client Private client

Delivered by Dave Groom as project and contracts manager, prior to founding Tatton Projects in 2020.

A hospitality fit-out where the building was the design. Exposed brick, original beams, blackened steel screens and a raw concrete floor — with all the services run on show rather than hidden.

That's harder than it looks. When the ductwork, conduit and steelwork are the finish, every bracket and every joint is a snag. Nothing gets covered up.

Project facts

  • Location Leeds
  • Contract Bar and restaurant fit-out
  • Status Complete

What we did

Scope of works.

  • Full front and back of house fit-out
  • Bar construction and back bar
  • Exposed services — ductwork, conduit, tray
  • Blackened steel screens and staircase
  • Exposed brick and lime finishes
  • Banquette and booth seating
  • Commercial kitchen extraction
  • Feature lighting

The challenge

What made it hard.

Every service was on show. When the ductwork and conduit are the finish, there is nowhere to hide a bad bracket.

The outcome

How it finished.

Delivered and opened on the agreed date.

Back bar against exposed brick, with track lighting on conduit
Back bar against exposed brick, with track lighting on conduit
Lounge under exposed beams and spiral ductwork
Lounge under exposed beams and spiral ductwork
Booth seating beneath the steel stair
Booth seating beneath the steel stair

References

References from this client are available on request. Tatton Projects is reviewed on Google; every review there is from a real client.

Got something similar?

Send us the floor, the plot or the drawing. You'll get a written cost plan from the person who'd run the job.

Hale basement conversion

Hale, Cheshire

Office walkways & communal toilets

£110K

Sentric Music

Liverpool