Home / Work / Office walkways & communal toilets
Office walkways & communal toilets

Office fit-out · Live building · 2026

Office walkways & communal toilets

Client Confidential client
Site walkthrough · before, during & after · 66 sTatton Projects

An occupied office building, trading throughout. The brief was to bring the common parts and welfare up to standard without closing the building.

The existing tiled walkways, lift lobbies and stair landings were stripped back to the raised floor, overlaid and levelled, then re-floored in grey LVT with new skirting. Off the car park, new blockwork and a mesh-secured bike store with galvanised racks. Below, a new communal toilet block — cubicle system, six-basin vanity run under round mirrors, flecked safety vinyl — alongside showers, a changing room with numbered lockers and an accessible WC.

Live floors stayed open behind protection while the work moved through the building.

Project facts

  • Contract Office fit-out — common parts and welfare
  • Status Complete

What we did

Scope of works.

  • Strip out of existing floor finishes to walkways, lobbies and stairs
  • Ply overlay, levelling and new grey LVT flooring with new skirting
  • New blockwork walls off the car park
  • Secure bike store — mesh enclosure and galvanised racks
  • Communal toilet block — cubicle system, vanity run and safety vinyl
  • Showers and changing room with lockers
  • Accessible WC
  • Plumbing, electrics and lighting to the new welfare areas
  • Works phased around an occupied building

The challenge

What made it hard.

The building stayed open. Every walkway being re-floored was also somebody's route to their desk, so floors were taken in sections behind protection and handed back as they finished.

The outcome

How it finished.

Handed over complete.

Before — the existing tiled walkway and one-way floor graphics
Before — the existing tiled walkway and one-way floor graphics
Strip out — old tiles lifted and stacked for removal on the atrium walkway
Strip out — old tiles lifted and stacked for removal on the atrium walkway
New blockwork walls at car park level
New blockwork walls at car park level
Secure bike store — mesh enclosure and galvanised racks
Secure bike store — mesh enclosure and galvanised racks
Communal toilets — timber carcass framing and first-fix plumbing
Communal toilets — timber carcass framing and first-fix plumbing
Cubicle system going in over new flecked safety vinyl
Cubicle system going in over new flecked safety vinyl
Changing room — numbered lockers, track lighting and shower rooms off the corridor
Changing room — numbered lockers, track lighting and shower rooms off the corridor
Shower cubicle — metro tiles, black-framed sliding screen and bench
Shower cubicle — metro tiles, black-framed sliding screen and bench
Accessible WC — wood-effect panelling, concealed cistern and black fittings
Accessible WC — wood-effect panelling, concealed cistern and black fittings
Six-basin vanity run under round mirrors
Six-basin vanity run under round mirrors
Atrium walkway re-floored in grey LVT along the glass balustrade
Atrium walkway re-floored in grey LVT along the glass balustrade
Lift lobby — new floor, skirting and planting
Lift lobby — new floor, skirting and planting

Got something similar?

Send us the floor, the plot or the drawing. You'll get a written cost plan from the person who'd run the job.

£110K

Sentric Music

Liverpool

£175K

Stockport service centre

Stockport

£375K

Wilmslow house

Wilmslow